New Driveway

Brookside – New Client

CVC replaced a failing driveway with a new tarmac surface

IMG_0911.HEIC
WhatsApp Image 2025-09-18 at 10.45.52_18454f22.jpg

OVERVIEW

Located within a small village, the property presented logistical challenges for plant, materials, and waste disposal. Despite this, the CVC team efficiently removed the existing driveway and reworked site levels to align with drainage requirements.

The works included installation of new kerbs and edgings, repair of boundary walls, and preparation of the sub-base. The driveway was completed with a smooth hand laid SMA tarmac surface.

The transformation was striking, and the client was delighted that the project was completed in under two weeks from start to finish.

IMG_2545.HEIC
WhatsApp Image 2025-09-18 at 10.45.55_8d9df492.jpg

KEY WORKS

IMG_2853.HEIC
WhatsApp Image 2025-09-18 at 10.45.55_e59306c6.jpg
WhatsApp Image 2025-09-18 at 10.45.55_68c36fbf.jpg
    CVC was appointed to replace a failing driveway with a new tarmac surface.