Bespoke New Build

Kerswell Barn – Existing client.

CVC was appointed by an existing client to deliver the groundworks package for a bespoke timber-frame new build near Honiton.

IMG_0911.HEIC
WhatsApp Image 2025-09-18 at 10.45.52_18454f22.jpg

OVERVIEW

The project began with CVC’s setting-out engineer producing an accurate site model from the approved plan drawings. The team then carried out all foundation works, including drainage, beam and block floors, utility ducts, and a face brick band course.

External works included the installation of drainage, scaffold matting, and a new treatment tank. The completed substructure was then handed over to the Principal Contractor for the timber-frame installation.

The client praised the speed, efficiency, and tidiness of the site, which reflected highly on the CVC team.

IMG_2545.HEIC
WhatsApp Image 2025-09-18 at 10.45.55_8d9df492.jpg

KEY WORKS

IMG_2853.HEIC
WhatsApp Image 2025-09-18 at 10.45.55_e59306c6.jpg
WhatsApp Image 2025-09-18 at 10.45.55_68c36fbf.jpg
    CVC was appointed by an existing client to deliver the groundworks package for a bespoke timber-frame new build near Honiton.